Add-on, £29 a month
Handover packs and O and M manuals, built as the job runs
List what a handover needs, say who provides each part, and collect it by link as the job goes on. Add COBie, aftercare, social value and one dashboard across your jobs.
Best for: Commercial and public sector contractors, and anyone handing over a building or a network.
Handover packs
Requirements and who provides each
Start from a preset for a building, a health and safety file or a network, then change it. Each line names who provides it and shows what is still outstanding.
Uploads by link
Send a subcontractor or supplier a one use link. They upload their files with no login. Partners with a login contribute free. Your team accepts a file or sends it back with a reason.
Generated sections
Sitestack builds parts of the pack from your own records, such as the drawing register, fire stopping register, open snags and the Part L evidence pack. They are filed in the job's handover folder when you compile.
COBie
Export COBie as a spreadsheet, built from the asset register, the job's places, check schedules and files on assets. The checks are listed before you download, and they do not block the export.
After handover and on the drawings
Aftercare plans
Plan soft landings visits and activities after handover, then record what was done and found. Each plan belongs to the job, or to a completion on it, and downloads as a PDF.
Network handover
Build the adoption pack, the private network owner's pack or the generation pack for a network you have built. It uses the same list, link and compile steps as a building pack.
Drawing pins on sheets
Pin a snag, a defect or an RFI to the spot on a drawing sheet. Anyone who can see both the sheet and the item sees where it is.
Weekly waiting on others email
A weekly email lists what is waiting on you, what is overdue and what you are waiting on others for. Each line gives the job, the item, who has it and the date.
The real app
On the phone and at the desk
Big buttons on site. Tables, filters and every record side by side in the office.














Screenshots show demo data.
Price
What Handover and Reporting costs
Every add-on is on while you try Sitestack. Keep the ones you use.
What it does not do. Sitestack records what you say a handover needs and what was provided. It never says a pack is complete or in order, and a COBie export is a spreadsheet built from your records, not a check of them. Social value presets are labels you confirm. Check your own obligations and your client's information requirements.
Handover and Reporting
£29a month
or £290 a year, ten months for twelve. Ex VAT.
- A flat price for the whole company, not per seat
- The same price on Starter, Growth and Scale
- Switch it on or off from the billing page
Questions
Handover and Reporting: what people ask
Does it tell me the handover pack is complete?
Do subcontractors need a login to upload?
Can it produce COBie?
Can I use it for a network handover?
How is it priced?
What happens if I switch it off?
Related
Works well with
- £59 a month
Contracts and Money
JCT and NEC4 administration, payments and cost.
More about Contracts and Money - £59 a month
Networks and Utilities
For HV, LV and utility contractors.
More about Networks and Utilities - In every plan
Snags and defects
Raise, fix and verify, with the client where you allow it.
More about Snags and defects
Start your 14 day trial
14 day free trial. Every tool is on while you try it. Your card is taken at sign up and nothing is charged until the trial ends.
03
Social value and your jobs together
Social value commitments
Build your own list of measures, with the framework label and source you choose. Record the commitments for a job. Sitestack ships no money values.
Returns from partners
Ask a partner for a social value return. They fill in figures, you accept it or send it back, and you export a report as CSV. Figures are totals, with no names or home postcodes.
Commercial dashboard
See every job in one table: payments, fair payment, cost and counts. A person sees only the columns they have the right to see.
Frozen when issued
Issue a pack and its contents are frozen as they stood. A later change is a new revision, so you can show what was handed over and when.